Service

Service

One-stop Process service

We provide an one stop service for our customers, from mould manufacturing, sintering, polish electroplating and
semi-finished products to finished products

  • Mold Manufacturing

    Mold Manufacturing

  • Injection Molding

    Injection Molding

  • Debinding

    Debinding

  • Vacuum Sintering

    Vacuum Sintering

  • Re-sized

    Re-sized

  • Polishing

    Polishing

  • CNC

    CNC

  • Laser Welding

    Laser Welding

  • Laser Engraving

    Laser Engraving

  • Packaging Assembly

    Packaging Assembly

Professional Technical Team

  • Professional Technical Team

    Since MIM products are formed by a mold similar to an injection mold, a high degree of freedom in geometric design can be obtained. As long as the injection mold can form a product, it can basically be manufactured by using the MIM process.

  • Professional Technical Team

    Yibi has established school-enterprise cooperation with Xi'an Jiaotong University to continuously introduce new talents.

  • Professional Technical Team

    Since its establishment in 2009, it has accumulated rich practical experience and obtained 1 invention patent + 23 utility model patents

  • Professional Technical Team

    Yibi obtained the national high-tech enterprise certification in 2019.

Efficient production

  • Offering quotation within 24 hours.
  • Mold production lead time in 10-15 days.
  • Sampling lead time in 5-7 days.
  • Mass production lead time in 7-15 days.
  • Each product is equipped with a technician to follow up the whole process.

Strict Quality Control Management

  • Passed the ISO9001 quality system certification.
  • The materials have passed ROSH, SGS certification, and can produce food grade and medical grade parts.
  • Yibi has established a special testing laboratory.
  • Each product has complete data records and long-term preservation, which can be traced at any time.

Order Process

  • 1. Inquiry

    1. Inquiry

    Support customized drawings (samples)

    Offering quotation within 24 hours

  • 2. Design

    2. Design

    12 people in design team

    Providing DFM report before making new mold

  • 3. Mold making

    3. Mold making

    Once making new mold, 100 years of maintenance

    The mold is scrapped and the mold production capacity is insufficient. Yibi will make a new mold free of charge.

  • 4. Manufacturing

    4. Manufacturing

    5-7 days for sampling

    7-15 days for mass production

  • 5. Inspection

    5. Inspection

    Independent SOP/SIP

    Strictly implement ISO9001

  • 6. Deliver

    6. Deliver

    99% prompt in time delivery rate

    Customized packaging and logo

FAQ

  • 1. What format is required for quotation drawings?

    The 2D drawing format can be DWG, DXF, PDF or image format. The 3D drawing software we use is UG and Pro/E. The 3D drawing format supports stp, step, igs or other formats that can be opened by UG and Pro/E.

  • 2. What information is needed for quotation?

    Quotation requires 2D and 3D drawings or physical samples, our company pays to customize the drawings or samples.

  • 3. What material parts can we produce?

    Powder injection molding process can produce parts in stainless steel, iron, cemented carbide and ceramic material

    CNC processing technology can produce parts in stainless steel, iron, titanium, copper, aluminum, zinc, plastic

  • 4. What is the minimum order quantity?

    Our minimum order quantity is determined by the value of the goods, and the minimum order value is 1000 USD

  • 5. What is the after-sale guarantee?

    1) For all the defects caused by YIBI, our company provides free return and exchange

    2) Customer product design changes, Yibi will actively cooperate with customers to improve.

CopyRight © 2020 YIBI All Right Reserved